[Construction Example] Electric Company Substation: Void (Cavity) Filling Work
The foamed polyurethane resin compressively strengthens the ground! It suppresses the occurrence of voids, cavities, and gaps after construction.
We would like to introduce a case of "void (cavity) filling work" carried out at a power company substation in Hokkaido. During the renovation work of the building, voids were observed under the concrete floor, leading to a request for void (cavity) filling to prevent issues before installing heavy machinery. The polyurethane resin injection work was carried out while confirming the height with a laser level, and it was confirmed that the polyurethane resin was densely filled, completing the construction. 【Case Overview】 ■ Construction Area: 57m2 ■ Maximum Void Size: 100mm ■ Area: Hokkaido / Power Company Substation ■ Construction Period: 1 day *For more detailed information about the case, please refer to the related links. For more details, please check the PDF materials or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other